PITTSBURGH (KDKA) – Work is scheduled to continue on the Parkway West this weekend.

The outbound side of the road will be closed Friday and Saturday nights, weather permitting.

READ MORE: Judge Won’t Dismiss 25 Murder Counts Against Ohio Doctor

The work starts at 10 p.m. and will run through 10 a.m.

READ MORE: Wife Of Greene County DA Granted A Protection From Abuse Order

The road will be shut down between the Green Tree/Crafton exit and the Interstate 79 interchange.

There will be a detour in place:

MORE NEWS: Man In Italy Uses Fake Silicone Arm To Try To Get COVID-19 Vaccine Certificate

Outbound (westbound)

  • Motorists will exit I-376 at the Greentree/Crafton (Exit 67) interchange
  • Bear left to north 121 towards Crafton
  • Turn left onto Mansfield Avenue (Route 3062)
  • Turn left onto Noblestown Road (Route 50)
  • Noblestown Road becomes East Main Street
  • Turn right onto Jane Street
  • Jane Street becomes Mansfield Boulevard
  • Mansfield Boulevard becomes West Main Street
  • Follow West Main Street to I-79
  • Take the ramp to northbound I-79
  • Follow northbound I-79 to I-376
  • End detour